Abstract [eng] |
This work describes the realized project management system, which is based on extreme programming methodology. Developed software makes it easier to control the software creation process. Extreme programming features have been implemented in the developed software. Was conducted an empirical study to determine the characteristics of the planning phase of a particular company. The planning phase has the greatest impact on project budget, success. An incorrect estimate of duration of the project has an impact on project delivery dates and lead to additional costs for the company, which is responsible for this. It was found that the accuracy of project estimates is about 70%. With empirical studies we have found that the support has the greatest impact on the software project estimates. Using developed software the ideal time was monitored. Within three weeks of the experiment, it was found that the support is about 30% of the calendar work, which has a significant impact on the time estimations of the project. |