Abstract [eng] |
The topic of Master final work Light sport aircrafts hangar load bearing structures in Vilnius district. Building is divided into three hangars, one is for big aircraft and two are for smaller ones. Middle part consists of two floors. Whole building is 55,25 meters long, 24,7 meters width, the height of bulding is 11,1 meter. In the final work building regulations and law, the construction process and project preparation are discussed. In the architectural part, architectural solutions and planning are discussed, also roof thermal insulation is calculated. Two steel trusses and beam, also concrete column and foundations are calculated in construction part. In technological and economic part is written about foundation assembling processes and two structures: steel truss and timber / steel composite truss are compared in the economical point of view. In work and environmental safety parts, fire safety and risk of foundations installing are discussed. Drawings of architectural, structural parts are attached which illustrate text part of the master work. |