Abstract [eng] |
The aim of the work is to select and analyze possible structural modernization variants of the building, to analyze the demand for heating and ventilation systems in the building, to design heating and ventilation systems. At present there is no activity in the premises, the building is ready for modernization. In my work I designed heating and ventilation systems, I selected the necessary equipment, I abandoned all the necessary calculations. The work consists of the following parts: explanatory note, exploratory, architectural, design, economic parts. |