Abstract [eng] |
The aim of the master final project is to design logistic centre building bearing structure, based on the most economic constructions, also prepare technical project drawings. Object is 4930,15 sq. m area, logistic centre in Kaunas free economic zone. This paper describes all requirements for object regulations, which should be fulfill during projecting of a building. It describes architectural solutions, general building information. The main part of this paper is structural part it includes design of reinforced concrete beam, reinforced concrete column, foundation, prestressed reinforced concrete floor. Economic comparison between truss and prestressed reinforced concrete beam. Exploratory part of the paper explores connection between displacements and structural connections. Work consist of ten parts: introduction, six chapters, conclusions, bibliographical entries and appendices. |